Energy references at Promecon

Selected references

Refurbishment of Amager Power Station, Copenhagen

The existing AMV1 Unit at Amager Power Station was due a major refurbishment. The new unit has a full-load nominal thermal input of 350 MJ/s, …

Heat accumulator tank, Funen Power Station, Odense C

The contract comprised the supply and erection of a 71,000 cu.m accumulator tank, including pipe systems, valves, pumps, filters, instrumentation, insulation and cladding. The roof …

Pressurised heat accumulator tank, Copenhagen S

The contract comprised the supply and erection of a 24,000 cu.m pressurised heat accumulator tank at Amager Power Station. The tank has a cylindrical jacket …

Aarhus Waste Incineration Plant, Aarhus N

The contract covers a new flue gas building and a new furnace-boiler building. Both are being clad with industrial glass. A new turbine building with …

Steel structures EnergiVerk Mongstad CHP Plant, Mongstad

StatoilHydro is currently expanding and refurbishing Norway’s largest refinery, in Mongstad. In order to use the surplus gas from the refinery, thereby reducing CO2 emissions …

L90 Incineration plant, Esbjerg

Volumes of waste are increasing, and additional incineration capacity was needed. Promecon was consequently awarded a construction contract consisting of the supply and erection of …